Productive wells are put into operation

15:47 29.04.2022 5393

https://www.oilgas.gov.tm/storage/posts/4491/original-1626b8f742ae62.jpeg

 As part of the implementation of the “Program for the development of the oil and gas industry of Turkmenistan for the period up to 2030”, specialists of the Korpeje drilling department of the «Nebitgazburawlayysh» trust of the State Concern «Turkmennebit» carry out large-scale work aimed at increasing productivity.

   In the year passing under the motto «Epoch of  people with Arkadag», the employees of the department carry out drilling work on the exploration and production oil and gas wells of Altyguyy, Southern Uzynada, Uzynada, Guyjuk.  The share of drillers is the main work on the search for productive layers of hydrocarbon raw materials in various oil and gas wells, their high-quality development and commissioning.

 Recently, drillers completed ahead of schedule the development of production well 165, located at the Altyguyy site, where a commercial inflow of «blue fuel» was obtained from the estimated design depth and a new well was put into operation.

 Thanks to the unprecedented efforts and support of the President of the country, the material and production base of the administration is improving.  The advanced, powerful drilling rigs purchased from abroad create great opportunities for drillers to develop deeper layers with confidence.

 Arazmyrat Ilamanov,
 Chairman of the committee of trade union organizations Drilling department Korpeje of the trust «Nebitgazburawlayysh» of the State Concern «Turkmennebit».

Other articles
167ea46df63a9a.jpg
Hero-Arkadag and Recep Erdogan noted the rapid development of bilateral cooperation

On Sunday, March 30, a telephone conversation took place between the National Leader of the Turkmen people, Chairman of the Halk Maslahaty of Turkmenistan Hero-Arkadag Gurbanguly Berdimuhamedov and the President of the Republic of Turkey Recep Tayyip Erdogan, TDH reports.


161d7d3d05697c.jpeg
Over 320 billion cubic meters of Turkmen gas supplied since the start of operation of the Turkmenistan-China gas pipeline, – CNPC

Since the opening of the transnational Turkmenistan-China gas pipeline in 2009, over 320 billion cubic meters of Turkmen gas have been exported to the Celestial Empire. General director of the branch of the National Petroleum Corporation of China (CNPC) Chen Huailong stated this, the Watan news program of the Turkmen television reported.


161d7e6c4b374f.jpeg
OPEC will be headed by a representative of Kuwait from August

At an extraordinary meeting of OPEC, the ministers elected a new secretary general of the organization – from August 1, 2022, Haitham Al-Qais from Kuwait was elected for a period of three years, Interfax reported.


167e40ac00528d.jpg
Modern Information and Analytical Center for sustainable energy development has been opened in Turkmenistan

Today, March 26, the grand opening of the Information and Analytical Center was held at the Natural Gas Research Institute of the State Concern "Turkmengas". The center is equipped with the latest IT equipment purchased with the support of the European Union project "Green Development of Turkmenistan: Policy Dialogue and Climate Action for 2024-2028", funded by the European Union and the German Foreign Ministry and implemented by GIZ.


167e7949424974.jpg
Preparations are underway for the 8th meeting of the Turkmen-Romanian Working Commission on Cooperation in the Energy Sector

On March 27, President of Turkmenistan Serdar Berdimuhamedov held a regular meeting of the Cabinet of Ministers via a digital system, the agenda of which included a number of issues of state life, TDH reports.