A new oil and gas well has been successfully completed at the Uzynada field

21:28 27.03.2026 3938

https://www.oilgas.gov.tm/storage/posts/16602/original-169c62a14aee0b.jpg

Work on new well No. 75 has been successfully completed at the Uzynada oil and gas field in Turkmenistan. This marks an important step in the implementation of the "Program for the Development of the Oil and Gas Industry of Turkmenistan until 2030" and confirms the high professionalism of the specialists of the State Concern Turkmennebit.

The new well was drilled using a Chinese ZJ-70-DB rig and reached a depth of 6,800 meters. The well's completion has ensured a stable flow of oil and gas condensate — up to 91.7 cubic meters per day. The drilling operations were carried out by a team from the Korpeje Drilling Department of the Nebitgazburavlayysh Trust, led by Tagangeldi Amanov.

Yegenmyrat Hallyev, Chief Geologist of the Korpeje Drilling Department, noted that the successes at Uzynada are the result of the President of Turkmenistan's ongoing support for the development of a key sector of the national economy. "Our specialists are confidently mastering modern drilling rigs, which allows us to work at deep horizons and efficiently extract abundant hydrocarbon reserves," he emphasized.

Currently, three wells are being drilled simultaneously at the Uzynada field. Modern drilling rigs make it possible to develop deep horizons, and specialists continue active work at the Barsagelmez, South Bugdayly, Atjan, Altyguyy, and Ekizak fields.

The new well has become a significant contribution to Turkmenistan's energy security and strengthens the region's position as an important oil and gas production center.

The drillers express their gratitude to our country's leadership for creating the conditions for working with modern equipment, which allows them to implement advanced technologies in production.

Other articles
1630608dd4382e.jpeg
Transactions for the export of LNG and jet fuel were entered at exchange trading

On Monday, August 22, 12 transactions were concluded at the State Commodity and Raw Materials Exchange of Turkmenistan for a total of $5.4 million, the ORIENT news agency reported.


163070ce276e13.jpeg
It is planned to increase hydrocarbon production in Balkan region

In the Balkan region, a key region in the oil and gas sector of Turkmenistan, it is planned to increase natural gas production to 11 billion cubic meters per year by 2025. The head of the Department for Analysis of Economic Risks of the Agency for Protection from Economic Risks under the Ministry of Finance and Economy of Turkmenistan, Hangeldi Gurbangeldiev, said this in a commentary for the official Turkmen press.


167e40ac00528d.jpg
Modern Information and Analytical Center for sustainable energy development has been opened in Turkmenistan

Today, March 26, the grand opening of the Information and Analytical Center was held at the Natural Gas Research Institute of the State Concern "Turkmengas". The center is equipped with the latest IT equipment purchased with the support of the European Union project "Green Development of Turkmenistan: Policy Dialogue and Climate Action for 2024-2028", funded by the European Union and the German Foreign Ministry and implemented by GIZ.


167ea46df63a9a.jpg
Hero-Arkadag and Recep Erdogan noted the rapid development of bilateral cooperation

On Sunday, March 30, a telephone conversation took place between the National Leader of the Turkmen people, Chairman of the Halk Maslahaty of Turkmenistan Hero-Arkadag Gurbanguly Berdimuhamedov and the President of the Republic of Turkey Recep Tayyip Erdogan, TDH reports.