Mary region successfully solves the problem of gasification of settlements
22:29 28.08.2020 7719
Another batch of pipes with a diameter of 325 mm for the construction of high-and medium-pressure gas pipelines has arrived at the "Marygazupjunchilik" Department.
These days on the campus of Mollanepes Wekilbazar district and other districts the efforts of the construction Department for the gasification of Mary region Association "Turkmengazupjunchilik" are the new pipes characterized by high durability. 1200 meters of pipes with a diameter of 325 mm have already been welded and laid, and the total length of the gas pipeline is 3000 meters.
Experienced gas workers have also mastered modern technologies for installation of equipment, construction of gas pipelines made of polyethylene pipes. The installation of such gas pipelines involves qualified specialists who perform high-precision welding and other types of work in accordance with international standards.
During the first half of the year, Turkmen gas companies completed construction and installation works of pipes with a diameter of 160 mm and a total length of 9100 meters.
Such works on further gasification of the territory of the Mary region are part of a set of measures to improve the social and living conditions of the population and increase the economic growth of the region.
The President of Turkmenistan took part in the opening of a new gas gathering station in Lebap region
As part of a festive trip last Saturday to the Lebap region, President of Turkmenistan Serdar Berdimuhamedov took part in the solemn ceremony of commissioning a new gas gathering station.
IUOG named after Ya. Kakayev and Petronas Carigali (Turkmenistan) signed a Memorandum of Understanding
The International University of Oil and Gas named after Yagshygeldi Kakayev and Petronas Carigali (Turkmenistan) Sdn Bhd signed a Memorandum of Understanding, the News Portal of the State Television and Radio Broadcasting Company of Turkmenistan reports.
Green technologies against desertification are being implemented at Galkynysh gas field
CNPC Chuanqing Drilling Engineering Co., Ltd., a branch of CNPC, is actively implementing a project to combat wind erosion of soils caused by frequent sandstorms and low vegetation at the Galkynysh gas field in Turkmenistan, according to a press release from CNPC.
Pakistani leaders are interested in implementing joint energy projects with Turkmenistan
The President and Prime Minister of Pakistan in their letters to the President of Turkmenistan Serdar Berdimuhamedov expressed their interest in promoting joint energy projects in South and Central Asia.
In the future, we will make every effort for long-term cooperation with Turkmenistan in the gas sector, - head of CNPC
The commissioning of a new facility in the Bagtyyarlyk contract area, the opening of which was attended by the President of Turkmenistan, is an unforgettable event for both Chinese and Turkmen specialists. This was stated by the President of the CNPC Board of Management Hou Qijun, speaking to the participants of the celebration on the occasion of the commissioning of a new gas gathering station in the Farap etrap of the Lebap velayat.