Preparation of gas networks for the winter season begins in Dashoguz region
21:10 13.07.2021 16425
Gas workers of the Dashoguzgazupdzhunchilik gas business enterprise located in the S. Turkmenbashi etrap, along with the work on gasification of the region settlements and maintenance of gas networks, have begun preparations for the winter season.
The implementation of the repair work program will ensure reliable and uninterrupted gas supply to all consumers during the load season on the gas distribution system.
As part of preparations for winter, more than 2,450 km of gas pipelines of various pressures, more than 670 gas distribution and gas control units are being diagnosed. In addition to servicing enterprises and organizations, there are about 21 thousand 700 farms on the territory of the etrap.
Specialists have already carried out repairs of gas pipelines more than once, both current and major. Extensive experience and high professionalism of the employees allow us to carry out the entire range of repair work, strictly observing the technical regulations.
Thus, a significant amount of work was carried out in the gengeshiks named after A. Kakabaev, Gurbansoltan eje, Goshakhovly. In the village of Arzuv, an overhaul of the 273 mm medium pressure gas network was carried out. Similar work was carried out in the village of Kirshenoy. A 159 mm low pressure gas pipeline was repaired here.
In addition, the gas workers of the enterprise carry out a number of measures to provide liquefied gas to settlements located in remote places on the territory of the Dashoguz region.
Achievements of the Seydi oil refinery
With great achievements and successes, the Seydi oil refinery is confidently moving towards new heights of progress, as evidenced by the company's socio-economic indicators this year.
«Nebitgazchykarysh»: 503 wells repaired in 11 months
The repairmen of the «Nebitgazchykarysh» enterprise of the State Concern «Turkmennebit» of the Balkan region have achieved great results since the beginning of 2021. The enterprise overhauled and commissioned 503 wells in January-November.
Government meeting considered the work of fuel and energy enterprises in the Balkan region
Vice-Chairman of the Cabinet of Ministers Shakhym Abdrakhmanov reported on the situation in the fuel and energy complex in the Balkan region at a government meeting chaired by President of Turkmenistan Gurbanguly Berdimuhamedov last Friday.
The amount of foreign exchange transactions on the exchange of Turkmenistan exceeded $90 million
68 transactions were registered at the auctions of the State Commodity and Raw Materials Exchange of Turkmenistan last week.
The President approved proposals for the rational use of oil refinery capacities
On February 28, President of Turkmenistan Serdar Berdimuhamedov held a regular meeting of the Cabinet of Ministers via a digital system, the agenda of which included a number of issues of state life, TDH reports.