TCOR is increasing the volumes of processing of "black gold"
11:20 31.03.2021 7443
The Turkmenbashi complex of oil refineries is steadily increasing the volume of oil processing. Since the beginning of 2021, the enterprise, armed with modern equipment, has processed more than 770 thousand tons of "black gold", from which petrochemical products of various assortments have been produced.
In particular, the work plan for this period for the production of various brands of gasoline was fulfilled by 111.6 percent.
Oil prices fall and end the week in the red, Brent - $108.84 per barrel
Oil prices fall on Friday, ending the week with a decline amid fresh signals that the US economy is slowing down and demand for energy resources may decline, Interfax reports.
Raisi: Iran is ready to continue sending Turkmen gas in a swap to Azerbaijan
Iran is ready to continue sending Turkmen gas to Azerbaijan through its territory. Iranian President Ebrahim Raisi stated this on Wednesday at a meeting with President of Turkmenistan Serdar Berdimuhamedov, the Iranian news agency IRNA reported.
Turkmen-Vietnamese business forum aims to realize the potential of bilateral cooperation
On June 29, the capital of Vietnam hosted a Turkmen-Vietnamese business forum aimed at developing new solutions and approaches to realizing the potential of bilateral cooperation and building up trade and economic relations between Turkmenistan and Vietnam. This is reported by the website of the Foreign Ministry of Turkmenistan.
Turkmenenergo will sign a contract with a Turkish company for the construction of the first solar-wind power plant in Turkmenistan
The State Electricity Corporation «Turkmenenergo» will conclude with the company «Çalik Enerji Sanaýi we Tijaret A.Ş.» (Turkey) contract for the design and construction of a solar and wind power plant with a capacity of 10 MW. The corresponding Resolution was signed by President Serdar Berdimuhamedov.