Preparation for the Autumn-Winter Season – at a High Level

https://www.oilgas.gov.tm/storage/posts/5775/original-1633c07cd5d106.jpeg
These days, employees of the Göroglyetrapgaz Gas Facilities Organization of the Daşoguzgazüpjünçilik Directorate, along with the uninterrupted supply of natural gas to the population of the etrap and organizations, are carrying out purposeful work to prepare gas equipment in the territory of the In this regard, it is necessary to note the work of the gas workers of the Service for the control of external gas pipeline and gas control units in cooperation with the specialists of the etrap branch of the Trust for gasification of the Dashoguz region of the Construction and Installation Direc

Чтобы дочитать материал