A tender for the turnkey construction of a separation, condensate collection and pumping unit at the Uzynada field was announced

16:58 04.04.2023 10081

https://www.oilgas.gov.tm/storage/posts/7264/original-1642bc3159eebe.jpeg

 The State Concern “Turkmennebit” has announced an international open tender for the development of proposals for the design, supply of equipment and materials, turnkey construction and provision of services for the commissioning of a separation, condensate collection and pumping unit at the Uzynada field.

 Interested companies are invited to submit an application to the SC “Turkmennebit” about the desire to participate in the tender, indicating the full name of the participant, his legal status, country of registration and details.

 Then you should get the specification of the lot, technical requirements and the main terms of the contract.  To do this, you need to receive an invoice for payment of funds in the amount of $575 (including VAT) or the equivalent in manats for participation in the tender.

 All interested potential suppliers can participate in the tender.  At the same time, applications from companies registered or having bank accounts in offshore zones are not accepted.

 All necessary information can be downloaded from the following e-mail addresses: www.oilgas.gov.tm and www.turkmennebit.gov.tm.

 Tender proposals are accepted within 30 working days from the date of official publication in the newspaper “Neutral Turkmenistan” of the announcement of this tender, but no later than 16.00 (local time) on the 30th working day.

 At the Uzynada field, located in the south-west of Turkmenistan, earlier the State Concern “Turkmennebit” and the State Corporation “Turkmengeology” carried out exploratory drilling of wells. Drilled ultra-deep wells have given commercial inflow of hydrocarbons.

Other articles
1665da15d5bfca.jpg
The President of Turkmenistan led a mass bike ride in Ashgabat

President of Turkmenistan Serdar Berdimuhamedov led a mass bike ride that took place on Monday in Ashgabat to celebrate World Bicycle Day.


1665ac40b4b2aa.jpg
The President of Turkmenistan noted the importance of further increasing natural gas production volumes

On May 31, President Serdar Berdimuhamedov held a regular meeting of the Cabinet of Ministers via the digital system, at which topical issues in the life of the country were discussed.


1644a0a97c3e06.jpeg
UAE Minister of State emphasizes the growing role of Turkmenistan in global energy security

The accelerating energy transition further highlights Turkmenistan’s critical role in maintaining global energy security as a stable and reliable supplier of hydrocarbon resources and as a country supporting the development of renewable and sustainable energy sources. This was stated by the Minister of State of the UAE, member of the board of directors of the Abu Dhabi National Oil Company (ADNOC), Abu Dhabi Development Fund Ahmed Ali Al Sayed, speaking at the International Forum on attracting foreign investment in the oil and gas industry of Turkmenistan, which opened on Wednesday in Dubai.


1644a58e189912.jpeg
At the Galkynysh field, annual production may reach up to 200 billion cubic meters of gas

In the future, with the implementation of seven stages of development of the giant Galkynysh field, the annual production of natural gas will reach about 200 billion cubic meters of “blue fuel”. This was stated in the speech of the head of the laboratory of the Scientific Research Institute of Natural Gas of the State Concern “Turkmengas” Irina Luryeva at the International Forum on attracting investments in the energy sector of Turkmenistan in Dubai.


161dbd7a3698dc.jpeg
Turkmenistan and Afghanistan ready to step up the construction of the TAPI gas pipeline

Representatives of the governments of Turkmenistan and Afghanistan expressed their readiness to continue cooperation in the construction of the TAPI gas pipeline and other infrastructure projects, the website of the Foreign Ministry of Turkmenistan reports.