Gubadag gas workers prepare networks for autumn-winter season

10:13 03.08.2026 955

https://www.oilgas.gov.tm/storage/posts/17511/original-16a7022ef8d594.jpg

Gas utility workers in Gubadag etrap — a structural unit of the «Daşoguzgazüpjünçilik» administration known as «Gubadagetrapgaz» — are carrying out major repairs and modernization of gas pipelines and gas-regulating equipment. The work is timed to the upcoming 35th anniversary of Turkmenistan's independence and is regarded as a labor contribution to the occasion.

The unified gas system of Gubadag etrap includes more than 14,150 kilometers of gas pipelines of various diameters and pressures, as well as over 450 units of gas-regulating and gas-distribution equipment. Since the start of the year, inspection, restoration, and major repair of gas pipelines have been carried out under an approved plan in the city of Gubadag and seven geneshliks: Bereketli, Amyderýa, Abadanlyk, Gökçäge, Baýdak, Bitarap Turkmenistan, and Ýaşlyk.

Painting, repair, and preparation for the autumn-winter season have already been completed on a medium-pressure gas pipeline with a diameter of 219 millimeters running from the Abadanlyk geneshlik to the Amyderya geneshlik, a 273-millimeter pipeline from the Baýdak geneshlik to the village of Ýekederek in the Gökýaýla geneshlik, and a medium-pressure pipeline with a diameter of 159 millimeters in the Bitarap Turkmenistan geneshlik.

Seasonal inspection, painting, and replacement of supports are currently underway on 89- and 114-millimeter gas pipelines in the Gökýaýla geneshlik. The work involves repair fitters Serdar Baynazarov, Merdan Yegelekov, Noker Sapargylyjov, Hemra Erkayev, and Penji Yusupov, as well as electric welders Erkebay Tajibayev and Dovletnazar Nepesov — employees of the outdoor gas pipelines and gas-regulating equipment service at «Gubadagetrapgaz».

Atamyrat Gurbannazarov, foreman of the outdoor gas pipelines and gas-regulating equipment service at Gubadagetrapgaz, said the repair and preventive maintenance carried out during summer are designed to ensure uninterrupted operation of the gas system in the autumn-winter period. He noted that the work has proceeded under the approved plan since the start of the year in the city of Gubadag and the seven geneshliks listed above.

Earlier, «Gubadagetrapgaz» employees, together with staff of the Dashoguz velayat branch of the construction and installation directorate for gasification under the «Türkmenýöritenebitgazgurnama» trust, carried out gasification of new settlements — Weliýap in the Gubadag geneshlik, Gumoba in the Bereketli geneshlik, and Gumlyoba in the Abadanlyk geneshlik — in line with national programs for gasifying new facilities and areas of the etrap.

Other articles
163070ce276e13.jpeg
It is planned to increase hydrocarbon production in Balkan region

In the Balkan region, a key region in the oil and gas sector of Turkmenistan, it is planned to increase natural gas production to 11 billion cubic meters per year by 2025. The head of the Department for Analysis of Economic Risks of the Agency for Protection from Economic Risks under the Ministry of Finance and Economy of Turkmenistan, Hangeldi Gurbangeldiev, said this in a commentary for the official Turkmen press.


1630859aadff9f.jpeg
Gas price in Europe exceeded $3,300 per 1,000 cubic meters

The spot price of gas in Europe on Thursday evening continued its active growth. A jump in prices at the end of the European trading session is usually the result of the influence of the growth of quotations in the Asian market, Interfax reports.


163086bb70e28b.jpeg
The price of Brent rose above $100 per barrel again

Oil prices are rising moderately on Friday morning after falling the day before, foreign media reported.


1630c5645f20d7.jpeg
The President of Turkmenistan dismissed the Deputy Chairman of the State Concern «Turkmennebit»

By the Decree of the President of Turkmenistan, Mammedov Toygeldi Bayrammyradovich was dismissed from the post of Deputy Chairman of the State Concern «Turkmennebit» as he failed to cope with the duties assigned to him.


1630608dd4382e.jpeg
Transactions for the export of LNG and jet fuel were entered at exchange trading

On Monday, August 22, 12 transactions were concluded at the State Commodity and Raw Materials Exchange of Turkmenistan for a total of $5.4 million, the ORIENT news agency reported.