President of Turkmenistan and head of ADB discussed priority areas of cooperation

21:42 12.11.2025 2440

https://www.oilgas.gov.tm/storage/posts/15605/original-169143555e8f7d.jpg

On November 11, President of Turkmenistan Serdar Berdimuhamedov received Masato Kanda, President of the Asian Development Bank (ADB), who was visiting our country, TDH reports.

The head of state expressed confidence that this visit would facilitate an exchange of views on the further development of bilateral economic cooperation.

Emphasizing that Turkmenistan's economic strategy places great importance on strengthening ties with reputable financial and banking institutions, Berdimuhamedov noted the effectiveness of long-standing collaboration with the ADB. Over the past 25 years, the bank has participated in financing a number of projects in Turkmenistan in the electric power, infrastructure, and railway sectors.

Today, the bilateral partnership is implemented within the framework of Turkmenistan's cooperation strategy. In particular, projects implemented under the Central Asia Regional Economic Cooperation (CAREC) program contribute to the development of Turkmenistan's economic, trade, transport, and energy systems and the training of highly qualified specialists.

As noted during the meeting, a Memorandum of Understanding was signed on May 17, 2025, between the State Committee for Construction of the City of Arkadag under the President of Turkmenistan and the ADB, opening up opportunities for expanding partnerships in energy, water and energy conservation, and the use of renewable energy sources in the smart city.

Strengthening cooperation in the fuel and energy sector was also identified as an important area of ​​cooperation.

During his visit, Masato Kanda held a number of meetings, which resulted in the signing of an Agreement between Turkmenistan and the ADB on Financing the Construction of a Secondary Medical School in Ashgabat, as well as a document between the Ministry of Health and Medical Industry of Turkmenistan and the ADB on cooperation in technical support.

Other articles
1648db22f2a139.jpg
Maxim Bortnikov – Managing Director at the Center for the Implementation of the Principles of Sustainable Development of Gazprombank:

“The theme of the International Conference held in Ashgabat is rather topical, as evidenced by the composition of its participants, including representatives of government agencies, large international organizations, banks, big gas companies, scientists, leading specialists and experts in the oil and gas sphere.


161fcd0f0f2000.jpeg
«Dashoguzgazupjunchilik» ensures the efficient use of «blue fuel»

The gas workers of the «Dashoguzgazupjunchilik» department continue to provide reliable and uninterrupted gas supply to consumers in the northern region of our country. Despite the period of maximum loads, qualified specialists ensure the stable functioning of the gas distribution system of the velayat in the heating season.


166db12ae3b164.jpg
Another well has been put into operation

An industrial flow of natural gas was obtained from a well drilled by the team of the Lebapnebitgazgözleg Expedition of the Türkmengeologiýa State Corporation at Tachmuradov site. This will be a worthy gift from the united team of the Expedition for the forthcoming large-scale holiday – the 33rd anniversary of Turkmenistan’s independence.


168470741ef8e2.jpg
The new hydraulic device is distinguished by its efficiency

The Department of Geology and Geochemistry of Yagshigeldi Kakayev International University of Oil and Gas has developed an “Innovative hydraulic device for displacing air from the cavities of drill pipes”.


168493b791621d.jpg
Since the beginning of 2025, the “Nebitgazchykarysh” Trust of the State Concern “Turkmennebit” has produced over 1.2 million tons of oil

Since the beginning of 2025, the “Nebitgazchykarysh” Trust of the State Concern “Turkmennebit” has produced 1 million 278 thousand 817 tons of "black gold". Much of the credit for this goes to the drillers of the “Nebitgazburawlayysh” Trust, who have drilled 57 thousand 246 meters of production wells and 16 thousand 51 meters of exploratory wells since the beginning of the year.