President of Turkmenistan approves measures to develop Uzynada field

06:17 23.06.2025 2672

https://www.oilgas.gov.tm/storage/posts/14335/original-1685654636128d.jpg

On June 20, President of Turkmenistan Serdar Berdimuhamedov held a regular meeting of the Cabinet of Ministers via the digital system, where a number of issues of state life were considered, TDH reports.

Vice-Chairman of the Cabinet of Ministers Batyr Amanov reported on the work carried out at the oil and gas fields under the jurisdiction of the State Concern "Turkmennebit".

It was noted that appropriate measures are currently being taken for further development, in particular, power supply to the recently discovered Uzynada field. Along with its energy supply, this will also provide additional volumes of electricity to other nearby fields.

In this regard, a corresponding proposal was submitted to the President of Turkmenistan for consideration.

Summarizing the report, the head of state noted that all conditions are being created for the identification and development of new hydrocarbon deposits in oil and gas fields under the jurisdiction of the State Concern "Turkmennebit". Having approved the prepared proposal to provide electricity to the recently discovered Uzynada oil and gas field, President Serdar Berdimuhamedov instructed the Vice-Chairman to carry out the appropriate work.

Other articles
1648db22f2a139.jpg
Maxim Bortnikov – Managing Director at the Center for the Implementation of the Principles of Sustainable Development of Gazprombank:

“The theme of the International Conference held in Ashgabat is rather topical, as evidenced by the composition of its participants, including representatives of government agencies, large international organizations, banks, big gas companies, scientists, leading specialists and experts in the oil and gas sphere.


161fcd0f0f2000.jpeg
«Dashoguzgazupjunchilik» ensures the efficient use of «blue fuel»

The gas workers of the «Dashoguzgazupjunchilik» department continue to provide reliable and uninterrupted gas supply to consumers in the northern region of our country. Despite the period of maximum loads, qualified specialists ensure the stable functioning of the gas distribution system of the velayat in the heating season.


166db12ae3b164.jpg
Another well has been put into operation

An industrial flow of natural gas was obtained from a well drilled by the team of the Lebapnebitgazgözleg Expedition of the Türkmengeologiýa State Corporation at Tachmuradov site. This will be a worthy gift from the united team of the Expedition for the forthcoming large-scale holiday – the 33rd anniversary of Turkmenistan’s independence.


168470741ef8e2.jpg
The new hydraulic device is distinguished by its efficiency

The Department of Geology and Geochemistry of Yagshigeldi Kakayev International University of Oil and Gas has developed an “Innovative hydraulic device for displacing air from the cavities of drill pipes”.


168493b791621d.jpg
Since the beginning of 2025, the “Nebitgazchykarysh” Trust of the State Concern “Turkmennebit” has produced over 1.2 million tons of oil

Since the beginning of 2025, the “Nebitgazchykarysh” Trust of the State Concern “Turkmennebit” has produced 1 million 278 thousand 817 tons of "black gold". Much of the credit for this goes to the drillers of the “Nebitgazburawlayysh” Trust, who have drilled 57 thousand 246 meters of production wells and 16 thousand 51 meters of exploratory wells since the beginning of the year.