Rural areas in Dashoguz region are being actively gasified

11:43 03.02.2025 1901

https://www.oilgas.gov.tm/storage/posts/13037/original-1679c852d2e309.jpg

Specialists from the construction and installation department of the “Türkmengazüpjünçilik” association are actively working on the gasification of rural areas in Dashoguz region. In 2024, they built 60 kilometers of new gas pipelines of various pressures.

Among the projects implemented last year was the construction of a medium-pressure gas pipeline more than two kilometers long, laid in the village of Ak Altyn in the Boldumsaz etrap.

The new gas pipelines built within the framework of the National Transformation Program are intended for the gasification of rural areas. In addition to the village of Ak Altyn, gas pipelines of various lengths were laid in the Shavat, Akdepe etraps and Gorogly etrap.

This ensures uninterrupted gas supply to consumers, increases the reliability of the gas infrastructure and the efficiency of its use.

A developed network of gas communications has been built in the Dashoguz region, fully satisfying the needs of the local population for natural gas. The number of such facilities increases annually, which contributes to the development of infrastructure in accordance with modern requirements.

In the northern region of the country, work is also carried out in a timely manner to maintain equipment in proper condition and ensure the safe operation of existing communications.

Other articles
161c96b2237a43.jpeg
The amount of foreign exchange transactions on the exchange of Turkmenistan exceeded $90 million

68 transactions were registered at the auctions of the State Commodity and Raw Materials Exchange of Turkmenistan last week.


167c2cca3e5035.jpg
The President approved proposals for the rational use of oil refinery capacities

On February 28, President of Turkmenistan Serdar Berdimuhamedov held a regular meeting of the Cabinet of Ministers via a digital system, the agenda of which included a number of issues of state life, TDH reports.


161c96b7e8e581.jpeg
«Nebitgazchykarysh»: 503 wells repaired in 11 months

The repairmen of the «Nebitgazchykarysh» enterprise of the State Concern «Turkmennebit» of the Balkan region have achieved great results since the beginning of 2021. The enterprise overhauled and commissioned 503 wells in January-November.


161c96bb4ca85b.jpeg
Government meeting considered the work of fuel and energy enterprises in the Balkan region

Vice-Chairman of the Cabinet of Ministers Shakhym Abdrakhmanov reported on the situation in the fuel and energy complex in the Balkan region at a government meeting chaired by President of Turkmenistan Gurbanguly Berdimuhamedov last Friday.


167c55bf58468f.jpg
The President of Kazakhstan confirmed his participation in the international peace forum in Ashgabat

The President of Kazakhstan Kassym-Jomart Tokayev confirmed his participation in the International Peace and Trust Forum, which is scheduled to be held on December 12 in Ashgabat. The head of Kazakhstan wrote about this in a letter addressed to the Chairman of the Halk Maslahaty Gurbanguly Berdimuhamedov.