These days, employees of the Göroglyetrapgaz Gas Facilities Organization of the Daşoguzgazüpjünçilik Directorate, along with the uninterrupted supply of natural gas to the population of the etrap and organizations, are carrying out purposeful work to prepare gas equipment in the territory of the etrap and the gas supply system as a whole for the autumn-winter period.
In this regard, it is necessary to note the work of the gas workers of the Service for the control of external gas pipeline and gas control units in cooperation with the specialists of the etrap branch of the Trust for gasification of the Dashoguz region of the Construction and Installation Directorate of the Türkmengazüpjünçilik Association for the overhaul of gas facilities in the villages and towns of the etrap. With their joint efforts, work on the overhaul and preparation for the autumn-winter period of gas pipelines of various pressures and gas control installations in Saparmurat Niyazov, Tekebay Kakabayev, Beyik Turkmenbashi and Gerogly Streets, the administrative center of etrap, the town of Gerogly, is currently being carried out at a high pace. This, in turn, will fully meet the needs of the urban population in “blue fuel”.