At Chalgerishbaba Square prospecting works are continued

Specialists of Management of "Lebapnebitgazgozleg" of the trust "Turkmennebitgazgozleg" of the State corporation "Turkmengeology" successfully drilled 3000 meters on one of wells of Chalgerishbaba Square located in the Lebap part of the Kara Kum Desert.   

Project depth of the well is equal to 4750 meters. Achievement of such results in so short terms became possible thanks to installation of a new derrick. It is intended for carrying out prospecting works.

In the work drillers use the newest equipment of the leading global manufacturers. In turn, it gives the chance to receive the best results in case of well-drilling.

Related news

2014