Management of "Marynebitgazgozleg" - on a front line of prospecting works

Specialists of Management of "Marynebitgazgozleg" of the State corporation "Turkmengeologyl received industrial inflow of natural gas by a daily output of 1 million cubic meters at a depth of 4548-4556 meters on the 1st well of Chelekbay Square. 

Also at a depth of 4511-4503 meters test works as a result of which inflow of natural gas was received by a daily output of 1 million 27 thousand cubic meters of gas were carried out.

Specialists of this management conduct work and on other sites of the region. As a result of the carried-out prospecting works on a well 3 "A" Osman Square at a depth of 4641-4544 meters inflow of natural gas was received by a daily output of 1 million 50 thousand cubic meters.

Now specialists of management carry out active drilling operations on the areas of the huge Galkynysh field. In particular, drilling operations on an operational well No.309 are successfully continued. So far the well is drilled on depth of 3523 meters.

Big rates conduct prospecting works on a well No.16 of the gas Tagtabazar field.

In the nearest future employees of management plan to start drilling operations on the 1st well of South Dzhurdzhi of the "Galkynysh" field.      

Besides, specialists of management conduct prospecting research works on prospective areas of Balkan Region. Now prospecting works on the 1st well of Gobek Square where 1780 meters have been drilled are in the final stage.

Related news

2014